Oct 27 -
The multipurpose infrastructure development, located along the Tana River and within Tharaka-Nithi and Kitui counties, is designed to generate 700 MW of hydroelectric power as well as store water for irrigation.
The multipurpose infrastructure development, located along the Tana River and within Tharaka-Nithi and Kitui counties, is designed to generate 700 MW of hydroelectric power as well as store water for irrigation.
It was published on October 27, 2026 on Semasocial.
It was written by Kenyans.co.ke on Semasocial.
News Source
Kenyans.co.ke Latest News
Comment