CMRS likely to inspect 7.5-km Pink Line elevated section from October 6 to 8

CMRS likely to inspect 7.5-km Pink Line elevated section from October 6 to 8

The Commissioner of Metro Railway Safety (CMRS) is likely to conduct the statutory safety inspection of the 7.5-km elevated section of Bengaluru’s Pink Line metro between Kalena Agrahara and Tavarekere from October 6 to 8.

Comment